Warning: getimagesize(https://en.presstletter.com/wp-content/uploads/2013/12/KHBT_House-B_Johannes-Marburg_01.jpg): failed to open stream: HTTP request failed! HTTP/1.1 404 Not Found in /home/customer/www/en.presstletter.com/public_html/wp-content/themes/Presstletter/single.php on line 42

Haus Berge – KHBT

Julia De Vito 03/05/2014 Europe No Comments on Haus Berge – KHBT

http://www.khbt.eu/

addition, wood, private home

KHBT_House B_Johannes Marburg_03

KHBT_House B_Johannes Marburg_04

KHBT_House B_Johannes Marburg_I01

KHBT_House B_Johannes Marburg_I02

KHBT_House B_Johannes Marburg_I04

KHBT_House B_Johannes Marburg_I05

KHBT_House B_Johannes Marburg_I06

KHBT_House B_Johannes Marburg_I07

KHBT_House B_Johannes Marburg_I08

KHBT_House B_Johannes Marburg_I09KHBT_House B_Johannes Marburg_I11

Idea

An additional storey has been built on top of the north part of the house to increase the floor area. In combination with an extension at ground level the house now provides more space for the family and their guests. The former 70ies character has been developed further with the result of an internal triple height staircase and a view diagonally through the house by continuing the split level idea up to the additional 2nd floor. The internal open space serves as communication zone while the private/intimate spaces like bed- and bathrooms are clearly separated.

Form

The shape of the existing building has been respected and transformed into a contemporary form with a folded roof structure.

Fa ade

The former wooden rain screen covering the 1st and 2nd floor has been kept as the concept and transformed into a new design of a fully insulated wall with a black waterproofed background layer and a front layer via thin vertical timber stripes on an irregular grid. The Facade has been developed by KHBT as well as produced and installed. This has been achieved through a thorough process of design including the various manufacturers as well as creating mock ups. The timber fins have been coated with a newly developed mineral based paint by the company Keim.

Project: Haus Berge, Transformation and Extension of a Villa built in 1977

Location: Offenbach, Germany

Year: 2012

Design Team:

KHBT Karsten Huneck, Bernd TrA?mpler

Client: undisclosed

Area: 320mA?

Cost: 600.000

Contract: Traditional, LPH 1-8 (Stages A-L)

Photographer: Johannes Marburg www.johannesmarburg.com

Scrivi un commento