Aatrial house – KWK promes

KWK promes: www.kwkpromes.pl

RESIDENTIAL, MONOLITH, ATRIAL BUILDING

01_03.

02_02.

03_07.

04_08.

05_09.

06_15.

07_00.

07_02.axonometry

Idea

One hectare site near the forest, where the building is designed has only one weak point: south-western access. An obvious conflict develops between the driveway and the garden. The idea arose to lower the driveway in order to separate it from the garden. This prompted another idea – of a driveway leading inside to the ground floor level, from underneath the building, which became possible thanks to the creation of an inner atrium with the driveway in it. As a result, the building opens up onto all sides with its terraces in an unrestricted manner, and the only way to get into the garden is through the atrium and the house. This in turn has made it possible to obtain a new spatial model of the house, which is the reverse of an atrial building. The aatrial house is closed to the inside and opened to the surroundings.

Project Name : Aatrial house

Project Location : Poland, close to Opole

Year Completed : 2006

Architect : Robert Konieczny

Collaboration: Marlena Wolnik, A?ukasz PraA?uch

Client: Private

Site area : 10057 m2

Usable floor area : 659,57 m2

volume :2055 m3

Design : 2002-2003

Construction : 2003-2006

Photographs: Juliusz Soko owski (photos n.1-2-3-5-6)

Olo Studio (photos n.4-7)

Scrivi un commento