Warning: getimagesize(https://en.presstletter.com/wp-content/uploads/2013/04/img_6.jpg): failed to open stream: HTTP request failed! HTTP/1.1 404 Not Found in /home/customer/www/en.presstletter.com/public_html/wp-content/themes/Presstletter/single.php on line 42

Curricular administrative building Lyc e Mar a Auxiliadora – SURco Arquitectura

Roberta Melasecca 11/04/2013 Senza categoria Comments Off on Curricular administrative building Lyc e Mar a Auxiliadora – SURco Arquitectura

SURco Arquitectura: http://www.surcostudio.cl

ICON, URBAN CAVE, STEEL ATMOSPHERE

img_6

img_19

img_3

img_5

img_17

img_12

img_14

img_9

 

The project fits in the reconstruction of a building belonging to Lyc e Maria Auxiliadora, which was severely damaged by the earthquake of 27/F. The building seeks, through the architecture, take a reading of the next iconic elements that could influence its resolution, where a rusty steel pediment facing the patina of the brick of the city’s Cathedral, and on the opposite axis, a deciduous plant wall accompanied by the greenery of the Main Square. The intersection of both fronts forms access double height that houses an image of the Virgin becoming a sort of urban Grotto.

 

Architects: SURco Juan Paulo and Felipe AlarcA?n Carre o

Project Name: Curricular administrative building Lyc e Mar a Auxiliadora

Location: O’Higgins and Kurt M ller corner faced square, Linares Cile

Year: 2011

Area: 367,7 m2

Comments are closed.